April 2014 Green Machine Florida Canyon Hourly Data 20140401-0430_Green Machine Florida Canyon Hourly Data.xlsx

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014. Averaged hourly data collected from the ElectraTherm's Green Machine, an Organic Rankine Cycle, running on geothermal co-produced fluids at the Florida Canyon Mine, Nevada with air cooled condensing. Data spans sporadically from April 1, 2014 - April 30, 2014

Data and Resources

Metadata Source

Additional Info

Field Value
Citation Date 2014-04-30T00:00:00-06:00

Harvest Information

Original ID f0000000-58cc-4372-a567-000000000415
Index Date 2019-10-17T13:19:43-06:00
Original Format ISO-USGIN
Original Version 1.2

Author

Name Joe Thibedeau
Position primary contact
Organization ElectraTherm, Inc.
Email jthibedeau@electratherm.com

Geographic Extent

North Bound 40.735
South Bound 40.335
East Bound -118.0683333
West Bound -118.4683333