July 2013 Green Machine Florida Canyon Hourly Data 20130731_Green Machine Florida Canyon Hourly Data.xlsx

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13. Averaged hourly data collected from the ElectraTherm's Green Machine, an Organic Rankine Cycle, running on geothermal coproduced fluids at the Florida Canyon Mine, Nevada with air cooled condensing. Data spans sporadically from July 1, 2013 - July 31, 2013

Data and Resources

Metadata Source

Additional Info

Field Value
Citation Date 2013-07-31T00:00:00-06:00

Harvest Information

Original ID f0000000-58cc-4372-a567-000000000242
Index Date 2019-10-17T13:19:09-06:00
Original Format ISO-USGIN
Original Version 1.2

Author

Name Alex Vanderhoff
Position primary contact
Organization ElectraTherm, Inc.
Email avanderhoff@electratherm.com

Geographic Extent

North Bound 40.555
South Bound 40.535
East Bound -118.2483333
West Bound -118.2683333