Newberry Well 55-29 Stimulation Data Newberry daily report 11-18-2012.pdf

The Newberry Volcano EGS Demonstration in central Oregon, a 3 year project started in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to run for weeks and deliver large volumes of water at moderate well-head pressure. Second, to stimulate multiple zones, AltaRock developed thermo-degradable zonal isolation materials (TZIMs) to seal off fractures in a geothermal well to stimulate secondary and tertiary fracture zones. The TZIMs degrade within weeks, resulting in an optimized injection/ production profile of the entire well. Third, the project followed a project-specific Induced Seismicity Mitigation Plan (ISMP) to evaluate, monitor for, and mitigate felt induced seismicity. Stimulation started October 17, 2012 and continued for 7 weeks, with over 41,000 m3 of water injected. Two TZIM treatments successfully shifted the depth of stimulation. Injectivity, DTS, and seismic analysis indicate that fracture permeability in well NWG 55-29 was enhanced by two orders of magnitude.

This submission includes all of the files and reports associated with the geophysical exploration, stimulation, and monitoring included in the scope of the project. Daily report of field operations

Data and Resources

Metadata Source

Additional Info

Field Value
Citation Date 2012-12-19T00:00:00-07:00

Harvest Information

Original ID f0000053-58cc-4372-a567-000000000271
Index Date 2017-06-28T09:40:48-06:00
Original Format ISO-USGIN
Original Version 1.2

Author

Name Trenton T. Cladouhos
Position primary contact
Organization AltaRock Energy Inc
Email tcladouhos@altarockenergy.com

Geographic Extent

North Bound 43.746106
South Bound 43.726106
East Bound -121.295593
West Bound -121.315593