Utah FORGE: Well Data for Student Competition well_survey_from_earth_model.csv

Well 58-32 (previously labeled MU-ESW1) was drilled near Milford Utah during Phase 2B of the FORGE Project to confirm geothermal reservoir characteristics met requirements for the final FORGE site.

Well Accord-1 was drilled decades ago for geothermal exploration purposes. While the conditions encountered in the well were not suitable for developing a conventional hydrothermal system, the information obtained suggested the region may be suitable for an enhanced geothermal system.

Geophysical well logs were collected in both wells to obtain useful information regarding there nature of the subsurface materials. For the recent testing of 58-32, the Utah FORGE Project contracted with the well services company Schlumberger to collect the well logs. Data exported from the site earth model

Data and Resources

Metadata Source

Additional Info

Field Value
Citation Date 2018-12-07T00:00:00-07:00

Harvest Information

Original ID f0000002-58cc-4372-a567-000000001111
Index Date 2019-08-16T05:51:59-06:00
Original Format ISO-USGIN
Original Version 1.2

Author

Name Robert K Podgorney
Position primary contact
Organization Idaho National Laboratory
Email robert.podgorney@inl.gov

Geographic Extent

North Bound 38.5148
South Bound 38.483935
East Bound -112.879748
West Bound -112.916367